En+ to invest $3.2 bln into thermal power plant construction in Irkutsk Region
2026-02-06 - 16:05
The power plant will consist of three power generating units to be put on stream in series during the period from 2028 to 2029
Share this post:
2026-02-06 - 16:05
The power plant will consist of three power generating units to be put on stream in series during the period from 2028 to 2029