First power generating unit of Kursk plant reach 40% capacity — Rosenergoatom
2026-01-30 - 13:05
The pilot operation program provides for the gradual increase of the power generating unit capacity to the 100% rated level
Share this post:
2026-01-30 - 13:05
The pilot operation program provides for the gradual increase of the power generating unit capacity to the 100% rated level